Construction Tips For Asphalt Mixing Plants

When LB2000 Asphalt Mixing Plant for sale is under construction, as a manufacturer of asphalt mixing stations, take everyone to take a look together!

Before the construction of the asphalt mixing station, the top soil filling material in the construction area of the asphalt mixing station should be removed, and the site should be kept dry and level to the design requirements. If the ground surface is too soft, the foundation should be strengthened to prevent the instability of the construction machinery and ensure that the pile frame is vertical.

lb800 asphalt mixing plant for sale

Immediately afterwards, the construction machinery entering the site must be inspected to ensure that the equipment is intact and assembled and commissioned under the premise of meeting the requirements. The verticality of the asphalt mixing station must be ensured. The deviation of the gantry guide and the verticality of the mixing shaft from the ground must not exceed 1.0. %.

Regarding the staking out of the high quality LB800 Asphalt Mixing Plant, it should be operated according to the pile plan, and the error must not be greater than 2CM. Configure 110KVA of construction electricity and Φ25mm water pipe for the asphalt mixer to ensure its power supply and various transportation management are normal and stable.

When the asphalt mixing station is positioned, the motor of the asphalt mixing station can be turned on. The wet spraying method can be used to pre-crush the cut soil to sink; wait until the mixing shaft sinks to the designed depth before starting to reach 0.45 ~ 0.8m / min. Speed lift drill shotcrete.