LB1500 Asphalt Mixing Plant

LB1500 Asphalt Mixing plant manufacturer provides low price high quality Asphalt Mixing plant made in China for sale.

Rated production capability (standard conditions): 125 t/h
Mixer rated mix capacity: 1600 kg/batch
Oil consumption (standard conditions): ≤6.5kg/t
Operation mode: manual, semi-automatic, automatic

Online Chat Inquiry

Features of LB1500 Asphalt Mixing Plant

1. LB1500 Asphalt Mixing Plant made in China consists of 12 major systems. It mainly includes cold material distribution system, drying heating system, lifting system, screening system, metering system, mixing system, dust removal system, powder supply system, asphalt supply system, finished product silo, gas path system and electrical control system.

2. The important components of the asphalt mixing plant are the drying system, vibration screening system, mixing system and control system.

3. One of the advantages of LB1500 Asphalt Mixing Plant for sale is its accurate screening system, which is mainly divided into 6 screening tracks. More accurate and fast ingredients, high-quality and efficient completion of work.

4. LB1500 Asphalt Mixing Plant provided by manufacturer has 6 patents, high quality and good service factory price, you deserve it.

Construction Location of LB1500 Asphalt Mixing Plant

The location of high quality LB1500 Asphalt Mixing Plan is very critical, and it has a direct relationship with the long-term operation of the mixing plant in the later stage.

The first point is to be familiar with the route of the construction site, because the transportation distance of the asphalt directly affects the quality of the asphalt. Therefore, when constructing the asphalt mixing plant provided by manufacturer, it must be fully considered to fully meet the site requirements. It is necessary to fully confirm the asphalt distribution according to the construction drawings in order to locate the approximate center position of the asphalt mixing plant.

LB1500 Asphalt Mixing Plant for sale

The second point is to understand and master the basic elements of the construction of the mixing plant, including water, electricity and floor space. Finally, it is about the surrounding environment of the construction site. As low price LB1500 Asphalt Mixing Plan is a processing base with a high degree of mechanized construction, Pollution such as noise will be serious. This requires that areas where people, livestock, etc., such as housing groups, schools, breeding and breeding bases, and livestock are concentrated should be avoided as much as possible in order to minimize the impact of the surrounding environment.

Construction Tips For LB1500 Asphalt Mixing Plant

1. Prior to the construction of LB1500 Asphalt Mixing Plant made in China, the top soil filling material in the construction area of the asphalt mixing plant should be removed, and the site should be kept dry and level to the design requirements. If the ground surface is too soft, the foundation should be strengthened to prevent the instability of the construction machinery and ensure that the pile frame is vertical.

2. Immediately check the incoming construction machinery to ensure that the equipment is intact and that it is assembled and commissioned under the premise of meeting the requirements. The verticality of the asphalt mixing plant must be ensured. The deviation of the gantry guide and the verticality of the mixing shaft from the ground must not be off. More than 1.0%.

3. As for the setting out of LB1500 Asphalt Mixing Plant for sale, it should be operated according to the pile plan, and the error should not be greater than 2CM. Configure 110KVA of construction electricity and Φ25mm water pipe for the asphalt mixer to ensure its power supply and various transportation management are normal and stable.

high quality LB1500 Asphalt Mixing Plant

4. After the asphalt mixing plant is positioned, the motor of the asphalt mixing plant can be turned on. The wet spraying method can be used to pre-crush the cut soil to sink; wait until the mixing shaft sinks to the designed depth before starting to use 0.45 ~ 0.8m. / min speed drilling and shotcrete.

Damage Analysis and Solution of Asphalt Mixing Plant Parts

Asphalt plant parts fatigue damage

Aiming at the different problems of the high quality LB1500 Asphalt Mixing Plant, the methods for solving the problems are also different. For example, when the components in the asphalt mixing plant are damaged and fatigued, they must be improved from the production of the components. On the one hand, it is necessary to improve the surface finish of the part. On the other hand, it can reduce the stress concentration of the part by adopting a milder cross-section filtration. The other is to improve the performance of the part by carburizing and quenching, so as to reduce the fatigue damage of the part effect.

Friction damage of asphalt plant parts

But what if the parts in the low price asphalt mixing plant are damaged due to friction? The simplest and most effective method is to use abrasion-resistant materials as much as possible, and to minimize the frictional resistance when designing the shape of the components of the mixing plant. In addition, corrosion is also one of the causes of component damage. Facing this situation, you can use nickel, chromium, zinc and other corrosion-resistant materials on the surface of metal parts, or oil on the surface of metal parts, and the surface of non-metal parts Apply anti-corrosive paint and other methods to prevent corrosion of parts.

SpecificationUnitValue

Productivity (under standard conditions)

t/h125

Oil Consumption (under standard conditions)

kg/t

≤6.5

Mixer Rated Mix Capacitykg/batch1600

Operation Mode


automatism control, Semi-automatism control and manual control

Hot Mixture Discharge Temperature

℃(common asphalt)130~160

Figure dimension

m

(length×width ×height): 35×31×15

Total installed power

kw356.57
Requirements
Fuel

Production Case

 

Large-scale concrete mixing plant project in Poland

After a Polish company wins a road construction project, the relevant person in charge considers that it is a large and medium-sized engineering project,

Read More